Creating a project

Available onEstimatorBuilder

From Projects List, choose New → Project.

Most of these fields are optional, but several feed things much further down the line — reports, claims, call-up sheets — so it is worth knowing which ones matter before you skip them.

Field What it is for
Name How the job appears everywhere. Use something you would say out loud.
Code Your job number. Appears on orders and reports.
Find the site address Start typing the address and pick it from Google’s list — the four fields below fill themselves in.
Street address Number and street, with the unit or lot if there is one: 3/15 Smith Street, Lot 320, 15 Lanning Way.
Suburb / State / Postcode Where the site is. Prints on purchase orders, and the postcode is where the weather on the Schedule, Bookings and Site Diary comes from.
Client Full Name The client on the contract. See Clients.
Email / Phone The client’s contact details.
Job Status Where the job is up to — drives the status filter on the list.
Supervisor Who is running it. Filterable, and used on site paperwork.
House Size Floor area, for rate-per-square-metre reporting.
Contract Price The agreed contract sum. Progress claims measure against it.
GST (%) The GST rate applied to this job.
This project belongs to Its place in the EPS — see Organising your projects.

Code. This is your job number and it ends up on every purchase order you send. Changing it later does not retrospectively change documents already issued, so agree the numbering convention with whoever does your accounts before the first job goes in.

Address. It prints on purchase orders. A blank address means a subcontractor gets an order with no site on it, and you get a phone call.

Fill in the postcode too. It is what places the job for the forecast on the Schedule and Bookings, and for the weather recorded in the Site Diary — without it, there is nowhere to look. If you don’t see the Find the site address box, type the four fields in yourself; they work the same either way.

Contract Price and GST. Progress claims and the costing metrics both measure against the contract price. Leaving it at zero does not stop you estimating, but the claimed-against-revenue figures will be meaningless until you fill it in.

House Size. Only used for $/m² reporting. Skip it and those reports come out blank; it is not used in any calculation that affects a price.

Creating the job used throughout this help centre:

Field Value
Name 18 Beach Road — Rear Extension
Code 2026-041
Street address 18 Beach Road
Suburb Torquay
State VIC
Postcode 3228
Client Full Name A & J Hendricks
Job Status Estimating
Supervisor Dave Marsh
House Size 54
Contract Price leave at 0 until the tender is submitted
GST (%) 10

Contract Price stays at zero deliberately. You do not have one yet — you are about to work it out. Come back and fill it in when the job is won.

A project on its own holds no prices. The next step is always a costing:

New → Costing — see Costings and templates.