Skip to content

Adding items

Available onEstimatorBuilder

There are four ways to get an item into the bill. Which you use depends on whether the work is standard for you.

Method Use it when
Add New Item A one-off you have no rate for
Import from Price Lists Work you do regularly and have rates for
Import Assembly A group of items that always go together
Duplicate selected Another item on this job is nearly the same

If you find yourself using Add New Item repeatedly for the same kind of work, that work belongs in your price list.

Field What it is
Code The item’s code, usually inherited from the price list
Item Name Short name, shown in the grid
Description The full wording, used on orders and reports
Item Size Dimension or spec, where it matters
Unit m, m², m³, each, hour, item, sum
Quantity See Getting a quantity
Wastage (%) Added on top of the quantity
Price Cost per unit
Item Markup Markup on this item alone
GST Whether GST applies
Note Visible internally
Internal Note Never leaves your office
Purchase Order Note Printed on the order sent to the supplier
Specification Text carried into the job specification
Includes What the item covers — useful on lump sums
PS/PC and Provision Provisional sum or prime cost allowance
Flag Marks the item for your own attention

They go to different places, and mixing them up is how internal margin commentary ends up on a subcontractor’s order:

  • Note — general, visible in the bill.
  • Internal Note — never printed on anything that leaves your office. This is where “check this rate, looks light” belongs.
  • Purchase Order Note — prints on the order. This is where “deliver to rear lane, no crane access” belongs.

In the bill, the Item column shows them under the item name so you can tell them apart at a glance: the description in grey, the internal note in pink, and the purchase order note highlighted in yellow.

Wastage (%) is added on top of the measured quantity. Measure 100 m² of tiles with 10% wastage and the item carries 110 m².

Put wastage here rather than in the measurement. The measured quantity stays an honest record of what is on the drawing, the wastage stays visible and adjustable, and neither is buried in the other.

Import from Price Lists opens a window over the bill with your price lists in it.

  • On the left, pick the price list, then a cost code. Type in the box above the tree to find one; All items shows the whole price list.
  • On the right, switch between Items and Products (the supplier products on those items), and search by code, name, description, SKU or supplier.
  • Click Add, or double-click a row, to put it in the bill.

The window opens on the cost code you are working in, when that cost code came from a price list. Each row tells you what you need before you pick it:

You see It means
In BOQ (or In BOQ ×2) It is already in this estimate — once, or that many times
Yours under the price Your company’s own price, set in Price lists. It takes the place of the standard rate
A boxes icon and a number The item has that many supplier products to choose from
A green tick by the cost code It belongs to the cost code you have selected
Superseded The supplier has replaced that product

Where it goes works exactly like + Item: it goes to the cost code it belongs to, and if you have a cost code selected and the item belongs somewhere else, you are asked which you want.

After you add an item that has supplier products, the product picker opens so you can choose one straight away. To add several things in a row instead, tick Keep this window open to add more: each one is confirmed at the bottom of the window, and the product picker is skipped.

On a job that is Under Construction or Finished, anything you add — from this window or with + Item — comes in switched off, so it doesn’t change the contract total. Switch it on if it should count.

If you have access to Price lists, the pencil on a row opens that item in Price lists in a new tab, and New item opens the new-item form there, filed under the cost code you are browsing. When you come back to the BOQ tab the window refreshes itself, so your change is already there.

The swap button on a row of the bill opens the same window, headed Swap item. Pick the replacement and click Swap: the item takes its name, description, unit and price, and keeps its quantity and cost code. Swap from the Products view to take a particular supplier product as well.

Imported items keep a Link to Pricelist, which is what lets you refresh rates later — see Suppliers and products.

An item you typed by hand has no link, so it will never pick up a price update. If the work is going to recur, add it to the price list and import it instead.

The price in the list is the price you get. It is your company’s price — including any price you have set yourself in Price lists, which takes the place of the standard rate — and that same figure is what lands in the bill. That holds for all three ways of using the list:

  • Importing an item — the item comes in at the price shown.
  • Importing a product (switch the list to Products) — the item comes in with that product attached and selected, at the product’s price shown.
  • Swapping an item — the replacement takes the price shown, and in the Products view, the product you picked.

Type into + Item and matching price list items appear as you type. Each one shows the cost code it belongs to — for example Concrete Supply — so you can see where it will go before you pick it.

If you have a cost code selected and the item belongs somewhere else, you are asked which you want:

  • Add to the selected cost code — it goes into the cost code you are working in.
  • Add to where it belongs — it goes into its own cost code. If that is under a different heading, the item is added under that heading instead, and won’t show in the cost code you are looking at; the message afterwards tells you where it went.

There is no question when the item already belongs to the selected cost code, or when no cost code is selected — then it simply goes where it belongs.

Only price list items filed under a cost code appear here, the same as in Import from Price Lists. An item with no cost code has nowhere to go; give it one in Price lists first.

An assembly is a group of items that always go together. A slab assembly might carry excavation, formwork, mesh, concrete, pump hire, and the labour to place and finish it.

Import Assembly brings the whole group in at once, so you add a slab rather than seven separate lines. Assemblies are also what take-off fields group under, so an assembly and its measurements line up naturally.

For the Hendricks extension, under cost center 310 Slab:

  1. Import AssemblyConcrete slab — waffle. Six items arrive.
  2. Set the quantity on the concrete item from the take-off field Slab concrete.
  3. Set the mesh and membrane quantities from Slab area.
  4. Add 5% wastage to the mesh.
  5. The pump hire is a fixed call-out — leave it at 1 item with a typed rate.

One assembly, two take-off fields, and the slab is priced and will follow any change to the drawing.

Duplicate selected copies items complete with rates and descriptions. Faster than re-importing when a job has several near-identical items — three bathrooms with the same fitout, say.

Duplicate, then change what differs. Watch the descriptions: a duplicated item that still says Ensuite while sitting in the main bathroom is the kind of thing that reaches a subcontractor’s order.

The quantity comes with it however it was worked out — including a formula, which keeps reading the same fields and items the original read. See Bulk operations.