The Bill of Quantities explained

Available onEstimatorBuilder

VideoThe Bill of Quantities: a tour1:46

The Bill of Quantities is the priced estimate. It is also the spine of everything that happens after the estimate — purchase orders, progress claims, variations and expenses all read from it.

Understanding the BOQ properly is worth the time even if somebody else builds it, because almost every downstream question turns out to be a question about an item.

The bill of quantities grouped by cost code

The bill, with its items under the cost codes they belong to.

A bill of quantities line open for editing

Each line carries its own quantity, rate, supplier and cost code.

Every item answers three questions: what is it, how much of it, and what does it cost?

Part Field Notes
What Item Name, Description, Item Size What you are buying or doing
Where Cost code Which trade it belongs to
How much Quantity, Unit, Wastage (%) See Getting a quantity
What it costs Price, Markup, GST See Prices, markups and GST

Quantity × price gives the item cost. Sum the items in a cost code and you have the trade total. Sum the trades and you have the job.

The box at the top left of the bill, beside Cost Codes, decides which cost codes the bill is showing. Click it and a panel opens with every cost code on the job, already scrolled to the one you are on, which shows in bold:

  • Each row tells you what is in it — how many items, and what they add up to — so you can see where the money is before you open anything.
  • The coloured dot and bar are the cost code’s status: teal for Completed, grey for Not Required, orange for Waiting for Quotation, an empty circle for Not Completed.
  • Type to find one. It matches the code and the name, so brick, 40-3 and painter all work. Press Enter to show the first match straight away.
  • The status chips narrow the list to one status, and Only with items hides the cost codes with nothing in them yet. It starts off, so every cost code is there to pick, including an empty one you are about to add items to.
  • Where your cost codes sit inside one another, the panel shows them that way, with the group above its members. Click the arrow to fold a group away.

Click a cost code’s name to show just that one — the quick way, same as before.

Until you ask for more, the list is one click, one cost code. Press Pick several at the foot of the list and tick boxes appear; clicking a name now ticks it instead of opening it. Tick the cost codes you want and press Show in BOQ, and the bill shows all of them together, each in its own section with its own sub-total. Tick a group and everything in it is ticked. Press Picking several again to go back to one at a time.

This is how you price related trades side by side — brick supply, lintels and the bricklayer on one screen — instead of stepping between them. When the bill is already showing several, the list opens with its tick boxes on.

Each section is headed with its place in your cost codes, code and name at each level — 40 External › 40-270 Brick Supply — so you always know which part of the job a line belongs to. This WBS in the totals bar becomes the budget of all of them together.

A few things work on one cost code at a time, and are greyed out while several are ticked:

  • Order, Invoice, Quote, Variation and Tender, on the ribbon and in the actions menu — each of them is raised against one cost code.
  • + Item and Paste, because a new line needs one place to go.
  • The cost code status dropdown and its note, as they are with All items.

Duplicate selected still works: each copy lands in its own original’s cost code.

To go back to one, click a name, or press Clear and tick just the one.

The BOQ toolbar has three dropdowns, and knowing which does what saves a lot of hunting:

Items — everything that creates or restructures items: Add New Item, Import Assembly, Import from Price Lists, Organise Items, Edit Cost Codes, Change Sorting, Show Orphan Items (which now opens Items in no cost code, the same window as Organise Items).

Operations — everything that acts on what you have selected: Copy, Cut, Paste, Select All, Delete selected, Duplicate selected, Switch on/off selected.

Reports — the outputs. See Reports.

A bill with one item switched off

The toilet hire is switched off. It keeps its 12 weeks and its $45 rate, and its total reads $0.00 — it is still there, it is just not counting.

Items can be switched on or off with the switch in the Inc column — blue and to the right is on, grey and to the left is off. A switched-off item stays in the bill, keeping its quantity and rate, but does not count toward the total.

This is how you price an option without deleting anything. Carry the tiled roof and the colorbond roof as separate items, switch on whichever the client wants, and the total follows.

Only Included Items filters the view to what is currently counting.

Where switching an item off works one line at a time, status works on a whole cost code. Each one carries a status you set from the dropdown at the top of the cost code, in this order:

Status What it means How it looks
Not Required This trade is not part of the job Plain
Not Completed Still being priced Pink
Waiting for Quotation Priced out, waiting on a subcontractor’s number Yellow
Completed Priced and checked Teal

Not Required contributes zero to the job total. Every item under it stops counting — not deleted, not hidden, just excluded from the money.

That is what makes a full standard structure workable on a small job. Import your fifteen-trade template onto a bathroom renovation, mark the eleven trades that do not apply as Not Required, and the total is correct without deleting anything you might want back.

The other three are progress markers for whoever is building the bill. Waiting for Quotation is the useful one on a live tender: it separates “I have not priced this yet” from “I have done my part and I am waiting on somebody else”, which are very different problems when the deadline is close.

Moving between cost codes, and the two statuses you set most:

Key Does
F9 Previous cost code
F10 Next cost code
F7 Mark this cost code Not Required
F8 Mark it Completed

Together those are a fast way to work down a bill: F10 to the next trade, price it, F8 to mark it done, F10 again. Trades that do not apply take one F7 and drop out of the total as you pass them.

With several cost codes ticked:

  • F10 moves to the cost code after the last one ticked, and F9 to the one before the first — on its own. Stepping walks the job, so it always lands you on one definite cost code.
  • F7 and F8 set the status of every ticked cost code at once, after asking you to confirm. Handy for marking a whole group Completed in one go.

Not Completed and Waiting for Quotation have no shortcut deliberately — they are the states you land in by working, not ones you jump to. Set them from the dropdown.

Inside the grid itself, the Quantity and Cost boxes behave like a spreadsheet:

Key Does
Enter Saves, and moves down the same column
Shift + Enter Saves, and moves up the same column
Tab Saves, and moves across to the next field

So you can key quantities straight down a trade without reaching for the mouse: type, Enter, type, Enter. The value in the box you land on is selected, so typing replaces it. Every one of those moves saves the box you just left — there is no separate save.

Because those edits save as you leave each box, there is no “cancel”. Instead:

Key Does
Ctrl + Z Undoes the last Quantity or Cost edit
Ctrl + Shift + Z Redoes it

The same two are on the toolbar as ↺ and ↻, and they grey out when there is nothing to undo or redo. Each one tells you which item it put back.

A few things worth knowing:

  • It covers the Quantity and Cost boxes — the ones you type into. The one-click toggles are not included; click them again instead.
  • It remembers the last 25 edits, and only in the cost code you are in. Switching cost code starts a fresh history.
  • While you are still typing in a box, Ctrl + Z is your browser’s own undo for the characters in that box. Ours takes over once you have left it — which is also the point at which there is a saved edit to take back.

PS/PC flags an item as a Provisional Sum or Prime Cost allowance — money carried for work not yet fully specified.

Flagging them matters because they are the items most likely to become variations. When the client picks the tapware and it costs more than the PC allowance, the difference is a variation, and having flagged the item makes that conversation straightforward.

Provision carries the allowance amount.

Once a job is running, money starts coming back the other way: purchase orders committed against an item, and invoices actually recorded against it. The BOQ compares both against what the estimate allowed for that item — its Total.

When either has passed it, the item is marked:

  • A pink bar down the left edge of the row, in the same place on every row so a long sheet can be scanned for it.
  • The Total goes pink with a warning triangle. Total is always on screen, which is the point — the Ordered and Actual Cost columns are optional, and an overrun you have to switch a column on to see is one you will not find.
  • Ordered and Actual Cost, when those columns are shown, go pink individually — so you can see which of the two blew, not just that something did.

Hover any of them for the detail: which figure, how much over, and the percentage.

Ordered and Actual are judged separately, never added together. An invoice normally settles an order that is already counted in the Ordered figure, so adding them would double-count and flag items that are perfectly fine.

Nothing here changes a number or blocks anything. It is a prompt to go and look.

Filter on the toolbar (the funnel icon), then tick Over budget, narrows the list to just these items. The Filter button turns pink while it is on, so a short list is never mistaken for an empty cost code.

The filters under Filter all work across the whole scope in view, not just the rows already on screen, and they combine: Over budget plus Included gives you the overruns that are still in the quote, leaving out the switched-off ones. The number on the button says how many filters are on; Show everything in the panel clears them.

Labour, material and subcontractors: cost types

Section titled “Labour, material and subcontractors: cost types”

The Set cost type window over the bill

Setting a cost type only sorts the items. No quantity, rate or total moves.

Every item has a cost type: Allowance, Fee, Labour, Material, Subcontractor, Freight, or any your company has added. It is how you answer “how much of this job is labour?”

  • Filter on the toolbar (the funnel icon):
    • Cost types - tick the types to show only those.
    • Group by cost type puts a heading over each type, with its item count and subtotal. Click a heading to fold it away. With several cost codes showing, the groups sit inside each cost code. Dragging items into a new order is off while grouped.
    • Totals by cost type turns on a line under the totals bar (off to start with).
  • The totals line, for example Labour 48,200.00 · Material 112,900.00 · Subcontractor 86,000.00, adds up the items on screen: the cost codes you are looking at, after any filter. Switched-off items count as nothing, as in the grid. Click a type to show only that type; click it again to show everything.
  • The Cost type column lets you change an item’s type right in the grid. It is off by default: turn it on from Choose columns (the columns icon at the right-hand end of the heading row).
  • Many at once: tick the items, then Actions → Set cost type.

Filter on the toolbar, then tick GST-free, shows only the items whose GST box says GST-free. These are usually council fees, certifier fees and some authority charges. It works like the other filters, over every cost code in view.

To change many at once, tick them and use Actions → Set GST. See Prices, markups and GST for what the setting affects.

Module Reads
Purchase Orders Items, to raise orders against
Expenses Items and cost codes, to code invoices to
Progress Claims Item values, to claim against
Variations Adds items to the bill
Take-Off Feeds quantities into items via fields

This is why an item’s cost code matters so much: it decides how the item is grouped everywhere else.

When a job’s stage is Under construction, its estimate is locked. The estimate is now the yardstick for progress claims, budget against actual cost, the over-budget warnings, Earned Value and your margin. A quantity or rate changed after signing would leave the client’s price where it was but quietly move every one of those figures. A bar across the top of the Bill of Quantities says the estimate is locked and why.

Under construction Finished
Quantities, rates, products, markups, GST Locked Locked
Adding, deleting, copying in, switching items on or off Locked Locked
Measurements that drive an item’s quantity Locked Locked
Flags, progress, notes, cost type, specification, colour selection Can change Locked
Orders, invoices, quotes, tenders, variations As usual As usual

To change the job after signing, raise a variation. That keeps a record of what changed and why, and gets the client to pay for it.

Unlocking. Moving the job back to an earlier stage (Production estimate is the stage meant for re-working the budget) unlocks the estimate. Only people with the Unlock an estimate under construction permission can do that; administrators have it, and an administrator can give it to others under Users.

Lock Ordered or Billed Items stops items being changed once an order or an invoice exists against them.

Turn it on. Editing the quantity on an item you have already ordered against silently breaks the relationship between what you committed and what you allowed, and the discrepancy usually surfaces months later.