Skip to content

Exporting and sharing

Producing a report is easy. Deciding what goes on it, and to whom, is the part worth thinking about.

Going to Use Why
A client PDF Fixed, readable, not invited to be taken apart
A lender or certifier PDF They want a document, not data
A subcontractor PDF, or a spreadsheet if they asked Depends what they will do with it
Your own office Spreadsheet You want to sort, filter and total it
Your accountant Spreadsheet Same

The default for anything leaving the business is PDF. A spreadsheet carries whatever columns were on screen, including ones you did not think about, and it invites recalculation.

Show Never show
The price they are paying Your cost
What is included Your margin or markup
Variations, with values Which subcontractor is doing what
Progress against the contract What you are paying subcontractors
The specification Internal notes

The risk is highest the first time you send a report you have not sent before, and the second time — when it feels familiar but you have not actually checked this version of it.

Their trade’s scope and quantities. Not the rest of the bill, not what you allowed for their work, and not what their competitors quoted.

Filter to the cost center before producing it.

Everything. Cost, committed, actual, margin, variance by trade.

BOQ items carry three note fields, and they go to different places:

Field Goes
Note Visible in the bill
Internal Note Never printed on anything that leaves the office
Purchase Order Note Printed on the supplier’s order

Use Internal Note for anything you would not want read aloud — “check this rate, looks light”, “only use this supplier if the other one is booked”. It is the field designed for exactly that.

Attach the reports you issue to the project in Documents — the submitted estimate, each progress claim, the signed selections schedule, the handover defect list.

Two reasons. You have a record of exactly what was issued and when. And anyone picking the job up later finds the history in one place rather than in a mailbox.

Name a file so it is identifiable a year later, out of context:

Weak Better
report.pdf 2026-041 Hendricks — Estimate Summary Rev A.pdf
claim.pdf 2026-041 Hendricks — Progress Claim 03 Frame.pdf
defects.xlsx 2026-041 Hendricks — Defect List 14 Nov.xlsx

Job number, job name, what it is, and which one. It costs a few seconds and saves opening six files to find the right one.